Home " Case Studies " Foundry
The project consisted of the installation of 2 Big-bag stations with 2 transfer systems equipped with buffer hoppers at ground distances of 5 meters and elevations of 1.50 and 2 metres.
The transfer protocol required a dosage for one of the products.