Specialist in water treatment

Sector: BTP Environment
The project

With elevations of 3 to 5 meters, the project involved feeding 3 unaligned buffer tanks at various distances, with a precise flow rate of 21 litres in 40 seconds with zero tolerance for variability.

What was the response?
  • A recovery hopper under a big-bag station
  • A triple outlet distribution piece
  • Three T14 feeders to transfer the resin from the big-bag station to a silo
  • Dosing systems integrated in the filling of containers.