Home " Case Studies " Construction Group
Enable operators to pour bags of different products (such as SBS, Solprene, Kraton...) at man-height and to lift the products into the reactor 12 meters above the ground.
Installation of a hopper with a bagging shelf, a distributor for breaking up the cakes and a flexible lift, taking into account the ATEX zone 22.